Intermittent rain all day; Grade and compact CAMU waste
Completed final scraping/excavation of Cell 2 of SWRP and collected bottem sample
Continue CAMU preparation at south end for liner; Continue final scraping/excavation of Cell 2 of SWRP
Transport Sludge from SWRP Final Excavation and Scraping Activities to Loadout Area and Haul to CAMU; Continue Excavation of Haul Rd in SWMU 6
Remove material containing asbestos to roll off containers in SWMU 6
Continue SWRP Final Excavation and Scraping Activities in Area 3; Prepare South Area of CAMU for Liner
Continue SWRP Final Excavation and Scraping Activities in Areas 2 and 3; Prepare South Area of CAMU for Liner
Continue SWRP Final Excavation and Scraping Activities in Areas 2 and 3; Prepare South Area of CAMU for Liner
Continue SWRP Final Excavation and Scraping Activities; Prepare South Area of CAMU for Liner
Completed final scraping in Area 1.
Continue surface preparation in CAMU. Move sludge from EQB to load out area in SWRP.
Continue excavation of Area 1.
Continue waste placement in CAMU from AOC 1, SWMU 6, and SWMU 7; Begin excavating and scraping Area 1 of SWRP to grade
Continue waste placement in CAMU from AOC 1, SWMU 6, and SWMU 7
Continue waste placement in CAMU from AOC 1, SWMU 6, and SWMU 7
Continue waste placement in CAMU from AOC 1, SWMU 6, and SWMU 7
Continue waste placement in CAMU from AOC 1, SWMU 6, and SWMU 7
Limited work crew on-site to add/blend LKD in SWRP and EQB
Resume hauling activities from SWMU 6 and SWMU 7
Dewater work areas after heavy rain.
Repair site following rain. Excavate haul road in SWMU 6 near marketing terminal entrance.
Excavation in SWMU 6 at North Perimeter (outside former fenceline).
Excavation in SWMU 6 at North Perimeter. Encountered deeper area of waste.
Continue CAMU Waste Management and Excavation in SWMU 6 at North Perimeter (outside former fenceline)
Continued excavation in SWMU 6 and SWMU 7; Envirocon to take day off tomorrow (Saturday March 5, 2011)
Continued excavation in SWMU 6 and SWMU 7
Continued excavation in SWMU 6, SWMU 7, and AOC 1
Excavation in AOC 1 only due to wet conditions